新闻中心
行业信息
船舶滞留缺陷学习 (十)
2023-08-31
85. ENCLOSED SPACE ENTRY AND RESCUE DRILL NOT HOLD ON BOARD AT LEAST ONCE EVERY TWO MONTHS (LAST DRILL ON 18-MAR-2023,INSPECTION DATE:13-JUN-2023).
86. RESCUE BOAT UNABLE TO SLEWING AND LAUNCH DUE TO THE CRANE MALFUNCTION.(救助艇释放装置不能进行举升和旋转操作,属于硬件故障)
87. THE DEWATERING VALVES INSTALLED IN BOSUN STORE AND F.P.T BULKHEAD OUT OF ORDER AS UNABLE TO BE OPERATED REMOTELY FROM BRIDGE.(艏尖舱和水手储藏间的遥控阀在驾驶台无法遥控操作)
88. CO2 pipeline to No.2 Cargo hold corroded and cracked
89. Water spraying system for the paint locker out of order.
90. The closing devices of two fresh water tank air pipes and steering gear room ventilation found seized.
91.The switch for daylight signalling lamp malfunction
92. The damper of engine room funnel ventilation cannot be closed
86. RESCUE BOAT UNABLE TO SLEWING AND LAUNCH DUE TO THE CRANE MALFUNCTION.(救助艇释放装置不能进行举升和旋转操作,属于硬件故障)
87. THE DEWATERING VALVES INSTALLED IN BOSUN STORE AND F.P.T BULKHEAD OUT OF ORDER AS UNABLE TO BE OPERATED REMOTELY FROM BRIDGE.(艏尖舱和水手储藏间的遥控阀在驾驶台无法遥控操作)
88. CO2 pipeline to No.2 Cargo hold corroded and cracked
89. Water spraying system for the paint locker out of order.
90. The closing devices of two fresh water tank air pipes and steering gear room ventilation found seized.
91.The switch for daylight signalling lamp malfunction
92. The damper of engine room funnel ventilation cannot be closed